๐Ÿ“‹ Project Planner

"How Long Will This Take?"

Every homeowner asks this before starting a project. Now you have an honest answer โ€” and a checklist to stay on track.

๐Ÿ“‹ Tell us about your project

Be honest โ€” these estimates are based on real homeowner times, not YouTube highlight reels.

One room โ‰ˆ 150โ€“250 sq ft ยท Full deck โ‰ˆ 200โ€“400 sq ft
๐ŸŒฑFirst Time
๐Ÿ”จDone a Few
โญVery Handy

Common Project Time Estimates

ProjectTime (Solo)Difficulty
Paint a bedroom (2 coats)4โ€“6 hoursEasy
Caulk kitchen / bath1โ€“2 hoursEasy
Replace a faucet1โ€“3 hoursEasy
Install laminate flooring (room)4โ€“8 hoursMedium
Stain a 200 sq ft deck3โ€“5 hoursEasy
Clean gutters (ranch house)2โ€“4 hoursEasy
Tile a bathroom floor6โ€“12 hoursMedium
Patch & paint drywall3โ€“6 hoursMedium
Lay 3 yards of mulch2โ€“3 hoursEasy
Paint exterior wall (1 side)4โ€“8 hoursMedium
Replace bathroom tile8โ€“16 hoursHard
Build a raised garden bed3โ€“4 hoursEasy

* Times include prep, cleanup, and drying waits. Add 50% if it's your first time doing the job.

๐Ÿ“‹
Fill in your project details
Your honest time estimate will appear here

๐Ÿ’ก The Golden Rules of Project Planning

1. Everything takes longer than you think. Double your first estimate.
2. Prep is 40% of the job. Rushing it ruins everything that follows.
3. Have all materials before you start. Hardware store runs kill momentum.
4. Stop at a logical breaking point. Halfway done is worse than not started.